Case study

How PVcase helps Goldbeck Solar maximize resources & automation

Goldbeck Solar logo

Key metrics

2weeks
onboarding new team members to PVcase
30%
engineering time reallocated to value-added tasks
2x
reduction in design optimization time

Summary

80% of solar projects end up in the shade. Goldbeck Solar wasn't willing to be part of that statistic.

As a long—standing force in solar project development, Goldbeck Solar knew their design workflows were slowing them down.

Manual terrain analysis. Workflow bottlenecks. Limited engineering bandwidth. In a competitive and rapidly evolving market, they needed a way to cut friction, speed up execution, and move projects decisively forward.

That's when they turned to PVcase.

Our powerful end—to-end platform gave them the tools to eliminate inefficiencies, increase design accuracy, and enable the team to focus on what really matters — developing high- performing solar projects. Faster. Smarter. At scale.

Challenges

Goldbeck Solar operates in a highly dynamic and resource— constrained solar market that brings up various obstacles — from a time—demanding manual design process to lacking human resources.

Such challenges were affecting the company's design process and productivity. Let's take a more detailed look into the challenges the company encountered:

Manual and time-consuming terrain analysis

Goldbeck Solar's team had to perform a significant amount of manual work for grading and terrain modeling. These tasks required extensive input from engineers, increasing the potential for human error and extending project timelines.

Inefficient design updates

Design updates took too long. Revisions based on grading or procurement changes created workflow friction.

Data consistency issues across software tools

Pulling data from disconnected systems led to inconsistencies and risk in decision-making.

Flexibility

Adapting to shifting variables—like equipment swaps—required full redesigns and ate into timelines.

Client experience

“The software is very good, we have no crashes and the fact that we can input data into calculator tools helps us a lot.”

Goldbeck Solar logo

Lasse Nieswitz

Head of Execution PC Germany

Solution

Goldbeck Solar turned to PVcase — an end-to-end solar project development platform that empowered the company to work smarter at every step of the solar project development cycle.

Automated grading and terrain analysis

Manual processes were replaced by automated, high-precision grading and cut— and-fill analysis solutions. PVcase identified balanced grading approaches in minutes — freeing engineers to focus on value added design work.

Flexible, rapid design iteration and scenario comparison

PVcase enabled the quick comparison of multiple layout options, empowering Goldbeck Solar to optimize the design based on specific site characteristics. This flexibility helped the team identify the most suitable configuration for each project with greater speed and precision.

Seamless GIS data integration

PVcase integration with high-resolution GIS data empowered the team to import detailed terrain models directly into their designs. This ensured that grading and other layouts were based on accurate, up-to-date topographic data, resolving prior data accuracy issues.

Simple user interface and reliable support

PVcase's intuitive design enabled interns to become proficient within two weeks, with designs requiring only a final engineering check. Also, PVcase's responsive support team ensured that issues were resolved swiftly.

Seamless adaptability

the software allowed quick adjustments to design based on procurement changes, saving significant time.

Results

The company has witnessed a staggering improvement in overall performance after adopting PVcase software. This strategic decision transformed the company's manual tasks into powerful and accurate workflows. Goldbeck Solar didn't just improve their process — they transformed it.

50% reduction in design time

The shift to automated grading processes with PVcase drastically cut the design time in half, enabling quicker project turna rounds. Automated processes saved engineering resources while retaining the need for skilled input, ensuring high-quality results.

Higher accuracy and less rework

The seamless integration of GIS data ensured that digital designs closely matched real-world site conditions, minimizing inaccuracies and the need for on-site adjustments.

Stronger collaboration and project management

The ability to share project data and updates through PVcase’s cloud-based platform improved communication across teams and stakeholders, leading to more efficient project execution.

Improved efficiency in onboarding

With PVcase training resources and a user-friendly interface, interns and junior staff became productive within weeks, freeing up senior engineers for more complex tasks.

Outstanding support

The PVcase team’s quick responses kept things running smoothly and saved valuable resources.

Client experience

“The support provided by PVcase is exceptional. Although there are other suppliers, none match the level of service PVcase offers.”

Goldbeck Solar logo

Lasse Nieswitz

Head of Execution PC Germany

About Goldbeck Solar

Based in Germany, Goldbeck Solar offers utility-scale PV systems for open spaces or industrial and commercial roofs, as well as commissioning and maintenance in Europe, South and North America, and Central Asia. With more than 20 years in business, the company has to offer an impressive industry’s know-how and clear values centered a round building mutual trust with its clients.

Explore our solutions

background image

See it for yourself

Turn complexity into clarity and confidently move your solar project forward

© 2025 PVcase