AUTOMATION

Saves engineers up to 30x time

Below are the average time estimates comparison for creating 21 MW solar site

Old-fashioned

Manually in 2D

With PVcase

Automated in 3D

Initial layout
30 min
10 min
Under 2 minutes for the generation
Comparison
150 min
10 min
No need to redo the entire layout
Stringing
350 min
6 min
String drawing, equipment placement & numbering
Cabling
120 min
4 min
DC & AC cabling convertable to 3D cables
Revisions
500 min
30 min
No need to replace the frames by hand - simply regenerate
PVsyst scene creation
20 min
3 min
One-click upload from DWG to PVsyst
Detailed Bill of Materials
1440 min
15 min
Detailed cable runs and 3D cable lengths

40+ h

1.3 h

(30x faster!)

3D TERRAIN BASED ENGINEERING

Results in up to 10% better precision for cabling and yield

Below are the average precision estimates comparison for example 8MW uphill solar site

Old-fashioned

2D environment

With PVcase

3D environment

Length of DC cable per 1 MW, m
35035
35992
2.66% better precision
Length of AC cable per 1 MW, m
2859
3141
8.97% better precision
Pitch type
Fixed
Fluctuating
Millimeter precision
DC power, kWp
7877
8834
11% increase
Produced energy, MWh
7383
8362
979 extra MWh
Performance ratio
85.9%
86.74%
Increase of 0,84%