Your engineers could already be working 30x faster and create 3D terrain based designs
Automation
Saves engineers up to 30x time
Below are the average time estimates comparison for creating 21 MW solar site
Old-fashioned
Manually in 2D
With PVcase
Automated in 3D
Initial layout
30 min
10 min
Under 2 minutes for the generation
Comparison
150 min
10 min
No need to redo the entire layout
Stringing
350 min
6 min
String drawing, equipment placement & numbering
Cabling
120 min
4 min
DC & AC cabling convertable to 3D cables
Revisions
500 min
30 min
No need to replace the frames by hand - simply regenerate
PVsyst scene creation
20 min
3 min
One-click upload from DWG to PVsyst
Detailed Bill of Materials
1440 min
15 min
Detailed cable runs and 3D cable lengths
40+ h
1.3 h
(30x faster!)3D TERRAIN BASED ENGINEERING
Results in up to 10% better precision for cabling and yield
Below are the average precision estimates comparison for example 8MW uphill solar site
Old-fashioned
2D environment
With PVcase
3D environment
Length of DC cable per 1 MW, m
35035
35992
2.66% better precision
Length of AC cable per 1 MW, m
2859
3141
8.97% better precision
Pitch type
Fixed
Fluctuating
Millimeter precision
DC power, kWp
7877
8834
11% increase
Produced energy, MWh
7383
8362
979 extra MWh
Performance ratio
85.9%
86.74%
Increase of 0,84%