Solar project lifecycle in one platform

Unify your workflow into one automated environment and break down silos between development and design teams

3D layout of a utility-scale solar project in the PVcase platform

Trusted by industry leaders

4.7
+481 reviews

The price of workflow silos

When every department uses a different tool for every project stage, data gets lost in translation. Data silos, mismatched files, and disconnected tools kill project velocity. Bring your teams into one connected workflow and move projects from concept to construction without any drag.

Key challenges with traditional solar project handoff

Siloed data

Critical project data (constraints, grid analysis, design revisions) lives in different systems, making status tracking impossible.

Data loss

Manual data transfers cause loss and mistakes that ripple through the lifecycle.

Version control chaos

Engineers and developers often work with outdated or non-synchronized design iterations.

Limited throughput

Lack of a single platform view for reporting and project metrics across the entire lifecycle, causing teams to spend time on admin and rework instead of growing their pipeline.

Slow iteration

Testing design changes across disconnected platforms limits agility and delays optimization.

The PVcase platform solution

PVcase platform visualizing solar workflows from site selection to engineering

The PVcase platform connects all your critical solar workflows — from site selection and detailed engineering to performance modeling — into a single, unified environment. By eliminating manual handoffs and centralizing project data, you gain consistency, accelerate collaboration, and significantly reduce time to NTP.

Why choose the PVcase platform?

PVcase map view showing a solar site with layout data ready for hand-off between tools

Hand-off data with zero friction

Instantly pull a site identified and optimized in PVcase Prospect into PVcase Ground Mount, pre-loaded with topography and constraint maps, eliminating manual setup time.

PVcase plugin inside CAD software displaying a 3D solar layout drawing

Unify project data in one place

Centralize all project and design information in one place, ensuring development, engineering, and finance teams are always working with the most current version

PVcase analytics dashboard with bar and line charts showing solar project performance data

Automate an entire project lifecycle

Leverage automation in every phase — from preliminary site filtering and layout creation to detailed design and final BOM generation — to grow pipeline without increasing headcount.

Spreadsheet of solar project data and bill of materials generated from PVcase

Combine data intelligence with CAD accuracy in the industry’s best platform

Unlock the unique advantage of combining competitive early-stage insights with the engineering precision needed for construction — delivering a truly integrated, end-to-end solution you won’t find with siloed competitors.

“We were spending too much time on drafting and not enough on decision-making. We needed a smarter, faster way to develop our projects.”

New Leaf Energy logo

Phil Hofmeyer

Responsabile tecnico di progettazione presso New Leaf Energy

More PVcase use cases

background imagebackground image

Try PVcase now

See our AutoCAD-based PV design solution in action and learn how it can benefit your business. PVcase leverages automation, a high level of precision, and intelligent algorithms to improve the efficiency, accuracy, and quality of PV designs.