How ANS reduced solar design handoffs with PVcase

After evaluating PVFARM, ANS moved to PVcase Ground Mount — keeping PV layouts, engineering constraints, and drawings connected in the AutoCAD environment where its team already works.

Client

ANS

Location

Columbus, OH, USA

Industry

Multi-disciplinary engineering

Employees

300+

Key results

4
disciplines, one workflow (Civil, structural, electrical, and PV design working from the same CAD base)
Less
rework during design revisions
More
traceable QA/QC using shared CAD base files
The Customer

Learn more about ANS

ANS is a multi-disciplinary engineering firm supporting renewable energy, data center, and infrastructure projects across the U.S. and Mexico. With much of its project work already happening in AutoCAD, ANS needed a solar design workflow that could carry PV layouts into detailed engineering without adding handoffs between platforms.

”PVFARM helped us compare configurations, but PVcase fit the way we actually engineer and deliver projects.”

Carlos Castro

LATAM PV & HV Engineering Supervisor at ANS

The Challenge

Engineering handoffs slowed design progress

Engineering handoffs slowed design progress

For ANS, project success depended on more than developing and comparing PV configurations. As projects moved forward, the team needed to account for constructability, grading, tracker limitations, equipment locations, electrical routing, access, and coordination between civil, structural, electrical, and other disciplines.

Fragmentation is now the industry's top constraint

ANS's experience reflects a wider pattern. According to PVcase's 2026–2027 State of Solar Project Development Report, the absence of a single source of truth is now the leading workflow bottleneck in solar development, cited by 67% of professionals — up 7 points year over year. The average project now touches 8 software tools, and engineers report using closer to 9.

Design revisions created extra verification

With ANS's previous workflow, revisions could mean modifying the layout in one environment, exporting it, bringing it back into CAD, verifying that everything transferred correctly, and then continuing with engineering drawings.

Disconnected information increased rework

As design inputs changed, ANS needed layout information, quantities, capacities, and engineering constraints to stay aligned. Maintaining multiple intermediate versions of the same information made every update harder to manage.

”The time savings didn't come from any single command being faster. The benefit was eliminating several intermediate steps every time the design changed.”

Carlos Castro

LATAM PV & HV Engineering Supervisor at ANS

The solution

A CAD-native workflow for engineering delivery

For ANS, the main difference was PVcase Ground Mount's AutoCAD integration. The team builds PV layouts and continues working in the same CAD environment where much of its engineering workflow already happens.

Layouts stayed connected to drawings

By keeping layout development inside AutoCAD, PVcase Ground Mount reduced the need to export, import, and recreate information between platforms — making the transition from preliminary layout into detailed engineering more direct.

Constraints became part of the workflow

PVcase Ground Mount gave ANS more control as projects moved from layout optimization into detailed engineering. The team works directly with topography, project boundaries, exclusion areas, roads, and tracker requirements — CAD information that becomes part of the engineering package.

Disciplines worked from shared information

PVcase Ground Mount helped different disciplines work from the same underlying design information. This was especially useful for structural coordination, where the team references the PV layout, terrain, tracker configuration, and constraints without translating information into a separate platform.

Results

Fewer handoffs, more confidence at every stage

The connected workflow gives ANS's engineers more time to coordinate across disciplines instead of managing intermediate file versions. Design and engineering happen together, and QA/QC is easier because every team works from the same source files.

Fewer intermediate steps per revision

On a utility-scale tracker project with several layout revisions, ANS's designers made adjustments directly in the CAD environment where the project was already being developed — eliminating the export-verify-reimport cycle required in its previous workflow.

Traceable QA/QC across disciplines

Because the PV layout is developed and reviewed against the same CAD base files used for the engineering package, ANS's engineers and designers verify quantities, capacities, and design information more easily.

Conflicts identified earlier

Having disciplines work from the same underlying design information makes it easier to catch conflicts or inconsistencies before the design moves to the next stage.

One workflow, from layout to delivery

ANS's team continues developing PV layouts as part of the actual engineering deliverable — keeping design connected to construction-ready output.

background imagebackground image